Eirich Basement Remodel
About this Project
This project featured framing out the basement walls, closets and bathroom as well as relocating the plumbing. Hanging and finishing of drywall for walls and ceiling was completed. A shower/tub combo was installed with toilet. Subway tile installed in the bathroom and tiling of the bar area. We finished with door and cabinet installation, carpet, and trim-work.
